--- Revision None +++ Revision 326563653164 @@ -0,0 +1,44 @@ +On Tue, Oct 6, 2009 at 11:03 AM, P.J. Eby wrote: +> At 02:45 PM 10/6/2009 +0100, Chris Withers wrote: +>>> +>>> To put this into a way that makes sense to me: I'm volunteering to keep +>>> distribute 0.6 and setuptools 0.6 in sync, no more, no less, and try and +>>> keep that as uncontroversial as possible, and get setuptools 0.6 releases +>>> out to match distribute 0.6 releases as soon as I can. +> +> That may not be as easy as it sounds; Distribute deleted various things from +> the setuptools tree (e.g. the release.sh script, used for issuing releases) +> and of course it adds other stuff (e.g. stuff to overwrite setuptools). So +> you'd need to screen the diffs. +> +> Second, I still intend to move setuptools 0.7 forward at some point, which +> means the patches also need to go to the trunk. + +Dream on. + +> If I had the time to co-ordinate and supervise all this, I'd have the time +> to just do it myself. + +I think at this point the community should not be forced wait for you +to get a new supply of round tuits. The wait has been too long +already. You can stay on in an advisory role, but I don't think it's +reasonable to block development or decisions until you have time. + +> If you want to help with that, the most helpful thing would be for you to +> consolidate all the changes into a pair of patches: one for the 0.6 branch +> and one for the 0.7 trunk. +> +> These patches would also need to exclude the SVN 1.6 changes (as I already +> have a change for that in my working copy, not yet checked in). They would +> also need to include appropriate changelog and documentation updates. +> +> If you can get those to me by Friday, I'll have them reviewed, applied, and +> released by Monday. I was already planning to spend a little time on bug +> closing and patch application this coming weekend, so if you can do this for +> me first, it will maximize the number I can get done. + +That's great, but I don't think it solves the structural problem, +which is that you don't have enough time to devote to the project. + +-- +--Guido van Rossum (home page: http://www.python.org/~guido/)